Installing the New Fuel Lockers
Installing new fuel lockers for saddle tanks. There will be two lockers, one on each side of the boat.
|
Rough-in to determine locker dimensions |
|
Fore and aft locker bulkheads.
So far, all locker plywood is ½-inch ACX, with epoxy coating
on the interior faces and fiberglass set in epoxy on the exterior faces. |
|
Aft bulkhead glued in using structural epoxy. |
|
Forward bulkhead and bottom glued in. |
|
Front panel glued in.
The front panel is sized so the tanks can be removed without cutting any wood. |
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.